The Zoning Board approved setback and coverage variances for a home addition in Aquebogue, and adjourned an application for parking requirement interpretations at a proposed Calverton indoor agriculture facility until October 22 pending an expert parking report.

Key actions

  • The board approved variances for Jean Monsees at 54 Cedar Street, Aquebogue, allowing reduced front, rear, and side yard setbacks and increased impervious surface coverage for a side and rear addition to her home.
  • The applicant testified the addition adds dining/rec room and closet space, does not add bedrooms, involves no wetlands or DEC jurisdiction, and neighbors did not object.
  • The board adjourned the application from 645 Grumman Blvd, LLC in Calverton until the October 22, 2026 meeting, pending submission of an additional consultant report on parking needs for the proposed indoor agricultural facility.

Discussed

  • The applicant for 645 Grumman Blvd, represented by an attorney and company principals, is proposing to convert existing industrial buildings on a 20-acre Natural Resource Protection zoned parcel into an indoor agricultural cultivation use, with no specific tenant or crop type yet identified.
  • The Central Pine Barrens Commission previously granted a hardship waiver limiting the site to a maximum of 211 parking spaces (196 existing/proposed plus 15 land-banked), reduced from an original approximately 305 spaces, with about 34,843 square feet of asphalt to be converted to green space.
  • The applicant proposed roughly 196 parking spaces based on an estimated 90 to 120 employees across the site, citing comparable indoor agriculture facilities elsewhere, but board members requested more detailed data, including consultant qualifications and calculation methods, given no code-specified parking standard exists for this use.
  • Board members and the applicant discussed that the facility could potentially be used for cannabis cultivation, and the applicant stated it is a landlord that will lease space to tenants who will handle interior build-out.
  • The applicant's attorney and representatives agreed to provide a follow-up report from their consultant, Third Act Architecture and Consulting, detailing qualifications, methodology, and comparable facility examples within about 30 days, ahead of the October 22 meeting.

Auto-generated from an unofficial, machine-made transcript. It may misstate names, figures, or votes. Verify against the agenda and the full transcript below.

Timestamped Transcript

Click any timestamp to jump the video to that moment.

0:00Thank you.
0:30Good evening everyone and welcome to the voting board meeting for Thursday, September 24th,
0:392026.
0:40Could we stand for the flag to the flag of the United States of America and to the republic
0:54which stands one nation under God, indivisible, with liberty and justice for all.
1:05Okay.
1:07You can start us off, please.
1:08Sure.
1:09So the first one, the first appeal is number 2026-018 for Jean Monzas
1:19Monza's at 54 Cedar Street and Aqaba County tax map numbers 600-113-2-73 and
1:31residents be 40 zoning they are requesting a variance for a side and
1:39your addition to the residents.
1:50Good evening, Mr. Purshanowski. Please raise your right hand. You solemnly swear to tell the truth, the whole truth, nothing but the truth, so I hope you're God.
1:57I do.
1:58Please state your name and address.
1:59Right. Vic Purshanowski. I'm working as a consultant with G. Monaces. It was the applicant here.
2:06She lives in a 749 square foot single family dwelling.
2:15As you guys know, it's a pre-existing non-conforming neighborhood prior to zoning.
2:24The variances that we're looking for are not out of character with the neighborhood.
2:30the basically what she wants to do is expand the dining area rec room 400
2:37square feet and add closet space to the main bedroom 175 square feet does not
2:45involve the Suffolk County Health Department we're not creating any
2:48bedrooms and the renovation is not more than 50% of the total which is the new
2:56Health Department guidelines for the septic the new integrated septic system
3:01so we're here tonight just to answer any of your questions the applicant is here
3:07and so we're open for questions so you just stated that she's proposing is this
3:17already constructed excuse me you stated that she is proposing right this does
3:24nothing's been constructed we need the variances of file for a building permit okay
3:32i really don't have any questions
3:36there is no dec or wetlands we're beyond the jurisdiction
3:47marissa did we receive any correspondence from anyone regarding this application
3:52There was no correspondences in regards to this application.
3:58So have any of the neighbors objected to this?
4:01No.
4:01In fact, they all got letters.
4:07Why don't you come on up and she'll explain.
4:10She spoke to all the neighbors, and she can put that on the record.
4:14Okay.
4:16Hi.
4:16Please raise your right hand.
4:18I do solemnly swear to tell the truth, the whole truth, nothing but the truth,
4:21help you God I do please state your name and address I live at I look Jean
4:27Monsi's I live at 54 Cedar Street I spoke to all my neighbors you know we
4:35have a very friendly relationship they love what I've done cleaning up the
4:39house and making it look nicer and they were all for it there were a few that
4:43said they would come but things happened and they couldn't make it when you went
4:48the building department was everything in order i mean did they they just asked you about the
4:55proposed addition were any all the decks in the water everything's in order everything's in order
5:00i applied for a co to replace the existing deck i already have that so they gave you the co they did
5:05okay they did so i did that um the deck was rotted old i replaced it all right and now i just want to
5:11add some closet space and a little bit of living space to make the house very good a little bit
5:17bigger so uh you heard me ask earlier i have a record here from the riverhead town court
5:27was a stop work ordered issued on the property when i first moved in i started to rip up the deck
5:36and then i guess someone from the town came and i went and immediately got a permit
5:41to actually do it the right way so that's all in order and then when you got the permit your
5:47applied for a cofd did the work i did and i have a co okay very good thank you thank you
6:01were any other improvements other than the deck as i have here a witness affidavit stating
6:11new windows remodeled kitchen remover of this center wall remodeled bathroom new siding when
6:29I guess whoever made the complaint about removing the deck the town came they actually came into my
6:35home and didn't it's inspection and that was all cleared up so I had the
6:40electrician came and someone else came there were a couple of men from the town
6:44that came and said we're good so that should be on the record that they
6:50actually it is yeah when she asked me to help write on this the first question I
6:58ASK BOB BECAUSE HE WAS HELPING HER TO BEGIN WITH TO GET TO EXPEDITE THE LETTER TO GO TO
7:06THE ZONING BOARD OF APPEAL SO I WANTED TO MAKE SURE I SAW THE CO AND I DOUBLE CHECKED TO MAKE
7:10SURE EVERYTHING ELSE WAS IN ORDER AND IT IS SO SO WHAT WE NEED IS JUST APPROVAL THEN WE CAN MAKE
7:15THE APPLICATION FOR THE BUILDING PERMIT ORDER THE ARCHITECTURAL DRAWINGS AND MOVE FORWARD
7:21I don't have the reading. Do you have a reading?
7:26I believe you have the reading.
7:28Do you have the reading?
7:30I believe you have it, actually.
7:32Okay.
7:32So, Mr. Chairman, with respect to appeal number 2026-018,
7:52I move that the appeal of Gene Monsey's 54 Cedar Street, Riverhead, Suffolk County tax map number 600-113-2-73
8:02residential B 40 zoning for variances and are relieved from Town Code chapter
8:07301 to 17 where proposed front yard setback is 13.4 foot and minimum
8:13required is 50 foot where proposed rear yard setback is 12.1 foot minimum
8:18required is 60 foot where proposed side yard a budding side street setback is 5.9
8:24foot minimum required is 50 foot and where the proposed impervious surface
8:28coverage is 35% while the maximum allowed is 15% be granted in accordance
8:34with the applications and sketches with amendments there too if any as filed
8:38with the building inspector second
8:43Godzilla, are you on?
8:46I see Mr. Godzilla on.
8:49Is he on?
8:50Godzilla?
8:51Okay.
8:52Mr. Zaweski.
8:53Aye.
8:55And I vote aye.
8:56Thank you.
8:57Good luck.
8:57Thank you.
8:58Good luck.
8:59Have a good night.
9:00Okay.
9:19So the next appeal is appeal number 20-26-019.
9:25It is entitled 645 Grumman Boulevard, LLC, located at 645 Grumman Boulevard in Calverton,
9:32Suffolk County Tax Map number 600-141-2-2.1.
9:39It is zoned as Natural Resource Protection, and they are looking for an interpretation
9:46for parking requirements to an indoor agricultural facility due to Town Code Chapter 301-231A.
9:5431A for reasonable and appropriate off-street parking requirements.
9:59All right, Mr. Cuddy, we don't have to swear you in.
10:02Welcome.
10:02Good evening.
10:03Charles Cuddy, 445 Biffing Avenue, Riverhead, New York, for the applicant.
10:08This is a site that some of you may be familiar with, but it's sort of off the beaten track
10:14because it's in the Grumman area.
10:17It's owned by Signature Partners.
10:19The principals are here with me tonight, Mr. Frost, Mr. Weiss.
10:24The architect, Arthur Rast, is also here.
10:27This is a building that's 66,000 square feet.
10:32It's on a 20-acre parcel.
10:35The parcel was reviewed significantly by the Pine Barren Commission.
10:40The Pine Barren Commission on May 20th gave them approval
10:44for what is an agricultural and horticultural use at that site.
10:48THE SITE ITSELF HAS SIGNIFICANT PARKING BUT THE PROBLEM IS IN GOING TO THE PLANNING BOARD,
10:58THE PLANNING BOARD COULDN'T DETERMINE ANY INDEX FOR THE PARKING IN THE COUNTY CODE SO THEY PASSED
11:06IT TO YOU THE ZONING BOARD TO MAKE A DETERMINATION AS TO WHAT WOULD BE APPROPRIATE.
11:12We believe that we have a number of examples that we can give you.
11:18Mr. Weiss is here.
11:20He will approach you and give you a handout, which I'm going to actually give you now.
11:28Mr. Weiss, if you come up.
11:40Mr. Rice, are you an attorney?
11:42no I'm the member of the applicant sir you sell me swear to tell the truth
11:49tell truth nothing but the truth so help you got I do please state your name and
11:53the address my name is Andrew Weiss jr. I'm the CEO of signature partners and
11:59co-managing member of the applicant 645 Grumman Boulevard LLC our office is
12:05located at 285 Sills Road in building 2 in Patchogue. We also have an office in
12:12Manhattan at 200 Madison Avenue. So we are embarking upon an adaptive reuse of
12:26of three existing structures that form 645 Grumman.
12:32We are focused on a indoor agricultural use,
12:37which is an as of right use in the NPR zone.
12:40We are not looking to change the envelope
12:43or footprint of any of the structures,
12:46and we will keep all the outlying structures
12:50as they were constructed over time.
12:52Oh, could be.
12:53So there is nothing that specifically addresses indoor agriculture within the code in terms of parking.
13:06We hired a group called Third Act Architecture and Consulting who are specialists in creating indoor agricultural.
13:17you know they design and build spaces for people that are in the indoor agricultural industry
13:28that better oh yeah okay you know so our consultants have assisted us in you know
13:40putting together parking and employee counts so we can determine how much
13:46parking we need in conjunction with the Pine Barrens Joint Planning Commission
13:53we there's enough asphalt on this site where there were three approximately
14:00three hundred and five parking spaces that were you know built for a very
14:06different use it was a you know is an office use primarily that they were
14:10created for. So we have reduced the count to approximately 190 spaces and we are going to
14:22convert 34,000 feet of what is currently asphalt into green space. The site is 20 acres. 10 of
14:33those acres are our pine trees which are going to be preserved we're not going to
14:39we're not going to touch those pine trees they will stay just as they are so
14:47we agreed to you know reduce our parking town to approximately 196 spaces and we
14:55have an additional 15 land bank spaces in case we are to need them in our
15:02evaluation of other indoor agricultural uses it was determined that the buildings
15:11and Charles was talking about the first building which is building 78 which is
15:16phase one of our development this building is in pretty good shape the
15:23roof was replaced and this building remains in very good condition the other
15:30two buildings did not have replaced roofs so it's kind of been raining inside of those buildings for
15:36the last 30 years they're going to need a little bit of work to say the least but we're focused on
15:43building 78 and the parking lots that surround building 78 however we have done a parking
15:50determination here for the entire site where we feel that the maximum number of employees that
15:56will be required will be 120 um you know minimum number you know is 90 you know and that's that's
16:03per shift um so we have a you know a substantial buffer uh with the 196 spaces that is that for
16:12phase one building 78 you called it excuse me i'm sorry is that calculation based upon operation
16:23within building 78 yes that is uh actually a combination of building 7808 and the third
16:33building which is a single story uh property total square footage calculation of the buildings you're
16:41referring is uh approximately 126 169 square feet and does that reflect total quote
16:51the site yes the only thing that number doesn't include are three small outbuildings of each are
17:01maybe a couple of hundred feet they're very small and you know we're gonna you know keep them
17:10refurbish them we have various uses for them for for example you know storing containers that were
17:21have refuse one will be for the gardener and another actually has the electric
17:28service for the third building located in that so if you look at the chart that
17:38Charles gave you there are several examples here um 645 Grumman is listed
17:48as first um the second is actually um there was uh this is van de weathering um for a period of time
18:01there was 30 000 feet that was used uh by a company called columbia care where they were
18:08doing indoor agriculture using grow lights and they occupied approximately 30 000 feet and they
18:17they had 27 employees. Also on Sound Avenue is a company called Flavor Fields that you know that
18:28grows plants under lights. Their facility is approximately 45,000 square feet. They have 40
18:37employees they have 60 parking spaces then there's an example in Massachusetts
18:45of a hundred and five thousand foot structure it's also used for the same
18:51purpose and they have 18 and 18 employees but they have a they have a
18:56fair amount of parking they have 70 parking spaces there and a company
19:03called uh living greens has two facilities um one of 44 000 feet and one of 200 the 44 000 foot uh
19:13property has 50 employees and 50 parking spaces and the 200 000 foot property that they have
19:21has a 120 employees with the same number of parking spaces and then we had one additional
19:29example on Birch Street in Massachusetts, which was a 26,450-foot building with 18 parking spaces
19:40and 18 employees. So all the parking spaces are intended for employees? Yes. There's not going to
19:53be any retail strictly wholesale operations and do you need any parking spaces for delivery trucks
19:59of yours or deliveries being made there any larger type of parking spaces um you know not that we're
20:06aware of we do have room for deliveries there's a there's there's a a lot of pavement around these
20:13buildings and um you know there's there's there's ample places for trucks to stop and uh and drop
20:19off a good trucks on site essence yes and we have there's a there's a a track
20:27that runs around the entire property making it for easy access
20:35So on this plan, is there any single loading zone?
20:48There is a freight entrance for the 78 building that is a roll door.
20:58that
21:00I don't have the
21:04site plan in front of me, but there's
21:06a fair amount of
21:08Thank you.
21:16So there's a
21:18very wide aisle
21:22there's an interior
21:24loading area inside of the building where several i think you could probably fit three or four vans
21:35actually inside of the building to be loaded but there's a lot of room to potentially line
21:40up trucks that might come in here that um can uh you know go straight out the uh the exit without
21:49having to go through any any parking lots or buy any of the cars the building 78 is flanked by two
21:55lots there's a there's a front lot and then there's a back lot that is a pretty good size
22:0478 is the one that has the good roof yes okay this area proposed uh
22:1234,843 square feet converted from asphalt.
22:22What's proposed in that thatched area?
22:27We're thinking of a grass field with some indigenous plantings.
22:35We haven't designed that yet.
22:37We do show some trees on the perimeter.
22:42WHICH IS OUTSIDE OF THAT 34,000 FEET.
22:47BUT WE, YOU KNOW, THERE'S A GOOD BUFFER ZONE BETWEEN US AND THE GOLF COURSE.
22:56IF YOU'RE LOOKING AT THE PLAN TO YOUR RIGHT IS THE GOLF COURSE.
23:03AND, YOU KNOW, THERE ARE A LOT OF TREES THAT WE'RE GOING TO RETAIN THAT ARE ALL OVER THE PROPERTY.
23:12but I'm thinking of this as a big grass field
23:17with trees and indigenous plantings.
23:22It's preserved.
23:25Yes.
23:31Just for the record, can I ask you,
23:34is there a chance of actually getting this
23:35with whoever actually completed the study?
23:39What would you like on that, sir?
23:41this right here it just it gives us comparable 645 comparable Boulevard I've already forgotten
23:46who actually did this for you would it be possible to get it yes I can I can redo this and we can put
23:53the name of our consultant in any other data that you would like integrated into that so would you
24:01agree that the number of employees and the number of parking could be impacted
24:11based upon the number of harvest the amount of automation the growth style
24:20the plant density I think the answer is yes but if you look at the numbers we
24:33have a minimum and a maximum and the maximum reflects when they're harvesting
24:40because they're gonna have extra people there to do that they're gonna harvest
24:44they're going to package um and they're going to ship so the um you know it will ebb and flow a
24:51little bit but we we the the expected number of employees is is closer to 90 and then it gets to
25:00be 120 during those periods
25:14just just to get on the record there's no proposed outside storage or anything else
25:18that would cannibalize any of those parking spaces no no outside storage will be i don't
25:23don't think it's allowed so under the code when he use is not identified on
25:30the parking schedule the code provides one parking space space per 300 feet my
25:42correct myself that's correct okay so that number would be over 400 parking
25:49spaces correct yes okay would be a lot of parking spaces right so uh
26:05in the presentation to planning board this area of
26:12proposed 34,843 square feet converted from asphalt.
26:23Was that presented as a landscaped area?
26:29And I'll tell you why I'm asking.
26:31In every other area on the map,
26:37you identify natural green space.
26:41here, it almost is worded like it could be converted to a building in the future.
26:55We'll be happy to write in anything you like there.
27:01You know, I think this site is...
27:06Yes.
27:06Well, you know, it's true that, you know, part of our hardship waiver is relegated to that we're not going to increase the footage here.
27:21Definitely not going to build another building.
27:24And we're going to renovate what exists.
27:29WE'RE EVEN LEAVING ALL THE OUT BUILDINGS BECAUSE THEY ADD SOME CHARACTER AND WE WILL USE THEM
27:37AS BEST AS WE CAN. BUT WE WOULD BE HAPPY TO WRITE IN THAT THERE'S NOT GOING TO BE A BUILDING
27:44SITTING HERE. AND WE WILL, AS WE ADVANCE THIS PLAN, WE WILL BE ABLE TO SHOW YOU EXACTLY
27:52WHAT WE WOULD LIKE TO PLANT HERE. NEW SPEAKER.
27:58you haven't decided yet what you're going to plant there or use those buildings for well so far we
28:04have the grass field um and then we have to you know look at the you know the contour of the land
28:11and and and we have to plan exactly you know what would be planted there no not on that land i'm
28:17talking about inside the buildings what what is that use going to be used for indoor agricultural
28:23use give me an example um there are a lot of uses out there um the uh you know we studied for
28:34example on our list here just to give you an idea um flavor fields is microgreens um you know
28:44columbia care who used to own van deweathering is no longer in business that was a cannabis use um
28:51living greens they actually do what is called aeroponics which is a new one for me and this
29:05is primarily done with lettuce and it's it's watered by mist I'm not even sure how they
29:11anchor the roots but it's it's it's an aeroponics use and I'm not a hundred
29:20percent sure what the other two facilities are but I'll get a definition
29:24for you
29:27mr. Cuddy I was going through the file you may have submitted it perhaps not to
29:35zba but do you have a copy of that grant of hardship thank you yes yes
29:48if you don't oh if you have an extra copy that would be very helpful yes we do great
29:55Do you operate any similar, quote,
30:20indoor agricultural growing operations or not we do not we we do own a fair
30:30amount of medical office space and some industrial space but what we have done
30:48is the you know this consultant is helping us to determine you know what these tenants are going to
30:57need in terms of a facility so we in doing that we design a facility and we get an idea of the
31:08various requirements in terms of lighting electric air conditioning load heating load how the plants
31:18are going to be watered we will have probably two large you know outside tanks that sit next
31:25to the building that will have fresh water that will be drawn and the plants will be watered
31:32with that but the consultants are helping to determine you know what these tenants need
31:39so we know how to how to address them if it was a medical tenant we would know exactly what to
31:46what to tell them so based upon my research the type of operation has an impact on parking and
32:05for the zoning board you're here because this is not an identified use in the parking code
32:13So it means it's unique, different, novel.
32:20So I think it would be beneficial for the zoning board to have an expert report
32:29identifying the type of operation and somebody who is, quote,
32:39experienced with traffic and parking analysis.
32:44Would you have an objection to submitting that?
32:49We'd be happy to.
33:02I guess voice my concern with that.
33:05It seems to me that this is a site that's remote.
33:09virtually from every other place if you've been there.
33:12And the parking is quite adequate.
33:15It's a question of how many spaces we need.
33:17But to go through a whole, essentially, traffic study.
33:21I wasn't suggesting traffic study.
33:25Somebody who's versed, then if you
33:29want to limit it to parking analysis based
33:33upon a particular use, that would be good.
33:37But the analysis we're giving you is that we're doing this indoor type of activity.
33:43And I don't understand how it would change anything somebody could add to it.
33:50Well, because I asked your client the question and he answered.
33:57Yes, parking can change based upon the type of grow operation on the level of automation,
34:09on the number of harvests, on the grow style, plant density.
34:14I mean, I'm not an expert at this, but certainly quick research on this, there are experts
34:24on it that can do a parking analysis for this type of use.
34:36Okay, we can't add to the parking that we have. We said we have so many spaces, we have so many
34:43employees. I'm not sure what all that would establish. I mean you're saying somehow that
34:49that would change things.
34:51We have so many spaces.
34:53We have so many employees, the type of activity
34:56that we're doing.
34:56In the future, it may change, but not now.
35:00They have something that they're working on.
35:02I just find that something extra for a place that
35:06has a lot of parking has a large building where there's
35:10going to be a certain type of use inside.
35:12And I just think it's sort of an add-on to ask for that.
35:15That's all.
35:17But earlier, it was stated that the parking, the number of 205 parking spaces, was intended for all the buildings on site.
35:33Not just Stage 1, Building 78, for all.
35:40We haven't, we don't have uses for those sites yet, so we won't know.
35:46I mean, someday we may have to come back here and say we need more parking, but we don't think so.
35:53We think that these spaces will be adequate for the entire site.
35:59And that's why I don't understand why we'd be doing this study.
36:01Your representation tonight is you're showing us a plant with close to 129,000 square feet.
36:16by advocating parking of 205 spaces for building 78 only.
36:30Okay.
36:30I think we can explain a little bit more.
36:33Do you mind?
36:33You have to raise your hand.
36:35Okay, hold on.
36:37It takes me a while to stand up.
36:39You're telling me the whole truth,
36:41and that's what the truth is, so help you God.
36:43I do.
36:43I'm Robert Frost.
36:44Mr. Weiss's partner same addresses as him. So just to clarify what the Central Pine Barrens Commission approved
36:51Okay, so we can't have more than this under their jurisdiction
36:55Is 211 spots of which 196 exist or will exist and 15 are land banked
37:02So that is the maximum that the Central Pine Barrens will approve for the whole site. We believe that we need
37:09120 ish spots for the entire site not for building 66
37:14for all of it. And that is consistent with the table that we provided you, which shows that in
37:20the tightest configuration, it's about one employee per 1,000 square feet. But in many
37:25configurations, it's even less than that. It's one employee per 1,500 square feet or something like
37:31that. So just to clarify, we believe that we're actually going to be significantly over-parked.
37:38We're going to be over-supplied for parking spaces from even the maximum that we would have during a
37:43cutting period. I will grant you that you're right. There could be different types of products.
37:50Perhaps indoor tomatoes are denser than indoor kale. I don't know. Just to be clear, we're in
37:55the real estate business. We are not going to be operating this facility. We're going to be
37:59renting this facility. But the order of magnitude difference between one of those products and
38:05another does not take us from 120 maximum spots to 240 maximum spots.
38:13So I think that's what Mr. Cuddy is getting to, to have a study or a letter that basically
38:19gives you these examples and maybe a few more from, it would presumably be from our existing
38:25consultant who are well versed in this and can provide their credentials, isn't really
38:29going to give you more information than that.
38:31is not a well-known or broadly done thing or not millions of indoor facilities we believe based on
38:40the consultants that we've hired that the maximum headcount that we will have for the entire site is
38:45120 and that's only during cultivation periods does that clarify well but you're not giving us
38:54any detail of why you have that belief that's all we're asking for this yeah is appreciated
39:06however there's no detail behind this in other words you're not giving us really examples of
39:17exactly what the type of growing or what is on these properties I bet I mean you
39:33know would that would that change the view would still be the same number of
39:40employees we think greater detail would be beneficial so we would propose if we
39:46were to do that that third act architecture and consulting provide that
39:50is that an acceptable consultant we have retained third act architecture and
39:57consulting to advise us on this project they are well experienced in the
40:01development and the construction of indoor agriculture would they be an
40:05acceptable consultant and would a letter from them that it provides more detail
40:12to you and what I just want to clarify because I don't I want to make sure we
40:23deliver what you want what would the report state that would help you in the
40:27report would explain number one their qualifications and experience number two
40:35what method did they undertake to do the calculation right I mean that's standard
40:44in a report how do you go from a to the end but these would be if they were
40:50providing this data they didn't necessarily build all these these are
40:53other projects but they they could talk about it there's and they could stay
40:58based upon review of the site plan and the square footage right okay and the
41:06detail that we do know regarding their proposed indoor growing plan and then
41:15give us the detail listen if that's what if that's what would give you comfort in
41:24terms of having more data we can do that I will say I do think that is a touch
41:29repetitive of what we've provided but I understand it that you want it with
41:33qualifications we can certainly have them prepare a report with their
41:37qualifications provide you with examples but I do want to be clear there aren't
41:42they are not going to have calculations in it they are going to provide you with
41:47examples of other facilities that have been developed they will state what
41:51which are not in this jurisdiction.
41:54They will state what was being grown in that facility.
41:59They will state how many employees, to the best of their knowledge,
42:03from public records there are, and how much parking was provided.
42:07If that is the detail that you need from them, we can probably ask them to do it.
42:12They may not have 50 examples.
42:14It may be 10 examples or five examples.
42:16I think to the extent that they could weigh in, to the extent that they have it, on the degree of, let's say, mechanization or automation, right?
42:29Because I'm assuming that there could be different stuff there.
42:31I think with what you mentioned, with something along those lines, at least for me personally, that would be more than fine.
42:37I will tell you that our concern originally in coming here was that you would actually reduce the parking further because the central pine barrens reduced the parking.
42:46So our concern is we want to keep the parking that we've been reduced to not that we're trying to minimize further
42:54right, that's why we're happy to have all these extra spaces because
42:58You know
42:59One day there may be trucks there. I don't know. That's not the original plan that they you know
43:03There's somebody might park their truck there. Excuse me when you went to the Pine Barrens was there a record of that?
43:09Yes, we've given it. Do we have that we have?
43:16the minutes right so our problem that's what we need to do our process was we originally
43:21want we bought this building in november of 2025 this property we immediately went to planning
43:26planning said you were in the central pine barrens area you need to go to them for a determination
43:31we went to them they were established that they would be the lead agency by the town and by others
43:37we then went through the central pine barrens process and they granted us a hardship waiver
43:41on May 20th of 26.
43:44That hardship waiver was based on a site plan.
43:46It's the same site plan, materially the same site plan that you've seen.
43:52We then went back to planning, and planning sent us here.
43:57So planning has, we have not proposed to planning anything about that planted area
44:01other than it's a planted area, because we haven't gotten into that part of the process yet.
44:07So has the planning department or the planning board,
44:09Have they questioned you as to what you intend to raise inside the buildings?
44:15Other than agriculture, I don't think so.
44:18Tomatoes and cannabis are two different things that run very quickly.
44:22Well, it could be cannabis.
44:23Shop up the money on it. It's going to be cannabis.
44:25It absolutely could be cannabis.
44:27You as the landlord, are you going to retrofit those buildings and mechanize everything inside the buildings,
44:34or are you just going to lease it and let them do the work?
44:36We are doing a certain amount of work.
44:38We have to make those buildings rentable.
44:40We have to clean them up.
44:42We have to –
44:43Put the roofs on, yada, yada, yada.
44:44And then presumably the tenants will build them out.
44:46And then they'll come in and do the interior structure and mechanisms to deal with what they're going to raise.
44:52Correct.
44:53And the reason we brought in Third Act was to advise us on what would a typical tenant in various different types of agriculture look like in that scenario.
45:01Well, my guess is that cannabis is the most profitable.
45:04Yes, listen.
45:05And that's what they would come to you for, to rent.
45:08And I know you guys are working really hard to avoid using that word.
45:11I'm not actually trying to avoid it.
45:12Because there will be interference probably from the public.
45:15I don't know.
45:16But I do know that it's a different kind of business.
45:20I will say this.
45:22We are not trying to avoid that conversation at all.
45:25I understand you're prepared to deal with it.
45:27No, no.
45:28And we are capitalists, right?
45:30We buy stuff to make money on it.
45:32Gotcha.
45:33But I would highlight something that makes this site very different.
45:36The first is this site is already zoned for a natural resource
45:39in the natural resource protection zone, which permits agriculture as of right.
45:43The second thing is we are nowhere near any homes.
45:49The closest home to the north is almost two miles away.
45:53The closest home to the east is 2.3 miles away.
45:58The closest home to the west is 1.4 miles away.
46:01And the closest home to the south is about two-thirds of a mile away through a forest.
46:08We are not proposing an agricultural building, whether it's cannabis or tomatoes, anywhere near anybody's home.
46:17This is an old industrial building in an old industrial area near nobody's home.
46:22And so I do think, since the town of Riverhead does permit these uses and has opted in, that this space is consistent with that intent.
46:31opposed to are we recognize that not every applicant here is necessarily
46:35always consistent with that and have made other suggestions so we're happy to
46:40comply with whatever you want in order to make those decisions I do think we
46:44are materially different in in some pretty core ways and yes I mean people
46:50are entitled to object that's the democratic process of course but you
46:54know we want to comply with what you want so we can now withstanding the fact
46:59that we may find it a touch repetitive we understand the process and you need
47:02to have the record right so we'll get you that letter and we will have the we
47:08will have our consultant establish their credentials in that letter Charles when
47:14do you think we could get that like they try to ask you what's the next state you
47:22want it on for I mean I think they have all the data I don't know that they're
47:33professional report writers of this nature so I think we can have it in a
47:37matter of weeks as opposed to a matter of months I would hope to have it for
47:42before the event to 30 days 30 that's fine so I mean the next meeting is
47:49October 22nd and I just put the new things and there was only two on for
47:57that so it's totally up to you at this point I would anticipate the way would
48:02have it you well before I'll cover sir how do you gonna be here anyway I'm a
48:0622nd I am isn't he always here do I have to be does that work the 20s hope that
48:15they can have it that time sure yeah we can I mean if you needed extra time
48:20simply contact Marissa did you want me to put it to the November date I would
48:28rather it for the October date because we're on April and they think they can
48:31have an October. Okay, great. Yeah. It's not they have the death. It's a question of them having the grammar. Thank you.
48:44Is anyone in the audience wants to speak on this subject? Anyone? Anyone on zoom?
48:52Nobody on Zoom.
48:54Okay.
48:56Motion to adjourn until October 22nd.
49:01Second.
49:02All right.
49:04Move to second it.
49:06Mr. Zawieski.
49:07Aye.
49:07Mr. Barnes.
49:08Aye.
49:09And I vote aye.
49:09So we'll see you on October 22nd.
49:12Thank you.
49:14Anything else, Marissa, that we have?
49:15How about meeting notes or anything like that?
49:18I do not have any meeting minutes at this time.
49:21So I'm hoping maybe by the next meeting I'll have some minutes.
49:26No, I'm just going to, Marissa, ask you to make this part of the record,
49:34the Pine Barrens Commission, and circulate to all zoning board members.
49:40You can email it.
49:41Thank you.
49:42Okay.
49:44If there's nothing else, can I have a motion to adjourn?
49:48Motion to adjourn.
49:49And close our meeting.
49:51All in favor? Aye.
49:53We all voted aye, so...
49:55It's aye-aye.

Full Transcript

Thank you. Good evening everyone and welcome to the voting board meeting for Thursday, September 24th, 2026. Could we stand for the flag to the flag of the United States of America and to the republic which stands one nation under God, indivisible, with liberty and justice for all.

Okay. You can start us off, please. Sure. So the first one, the first appeal is number 2026-018 for Jean Monzas Monza's at 54 Cedar Street and Aqaba County tax map numbers 600-113-2-73 and residents be 40 zoning they are requesting a variance for a side and your addition to the residents.

Good evening, Mr. Purshanowski. Please raise your right hand. You solemnly swear to tell the truth, the whole truth, nothing but the truth, so I hope you're God. I do. Please state your name and address. Right. Vic Purshanowski. I'm working as a consultant with G. Monaces. It was the applicant here. She lives in a 749 square foot single family dwelling. As you guys know, it's a pre-existing non-conforming neighborhood prior to zoning. The variances that we're looking for are not out of character with the neighborhood. the basically what she wants to do is expand the dining area rec room 400 square feet and add closet space to the main bedroom 175 square feet does not involve the Suffolk County Health Department we're not creating any bedrooms and the renovation is not more than 50% of the total which is the new Health Department guidelines for the septic the new integrated septic system so we're here tonight just to answer any of your questions the applicant is here and so we're open for questions so you just stated that she's proposing is this already constructed excuse me you stated that she is proposing right this does nothing's been constructed we need the variances of file for a building permit okay

i really don't have any questions there is no dec or wetlands we're beyond the jurisdiction

marissa did we receive any correspondence from anyone regarding this application There was no correspondences in regards to this application. So have any of the neighbors objected to this? No. In fact, they all got letters.

Why don't you come on up and she'll explain. She spoke to all the neighbors, and she can put that on the record. Okay. Hi. Please raise your right hand. I do solemnly swear to tell the truth, the whole truth, nothing but the truth, help you God I do please state your name and address I live at I look Jean Monsi's I live at 54 Cedar Street I spoke to all my neighbors you know we have a very friendly relationship they love what I've done cleaning up the house and making it look nicer and they were all for it there were a few that said they would come but things happened and they couldn't make it when you went the building department was everything in order i mean did they they just asked you about the proposed addition were any all the decks in the water everything's in order everything's in order i applied for a co to replace the existing deck i already have that so they gave you the co they did okay they did so i did that um the deck was rotted old i replaced it all right and now i just want to add some closet space and a little bit of living space to make the house very good a little bit bigger so uh you heard me ask earlier i have a record here from the riverhead town court was a stop work ordered issued on the property when i first moved in i started to rip up the deck and then i guess someone from the town came and i went and immediately got a permit to actually do it the right way so that's all in order and then when you got the permit your applied for a cofd did the work i did and i have a co okay very good thank you thank you

were any other improvements other than the deck as i have here a witness affidavit stating new windows remodeled kitchen remover of this center wall remodeled bathroom new siding when I guess whoever made the complaint about removing the deck the town came they actually came into my home and didn't it's inspection and that was all cleared up so I had the electrician came and someone else came there were a couple of men from the town that came and said we're good so that should be on the record that they actually it is yeah when she asked me to help write on this the first question I ASK BOB BECAUSE HE WAS HELPING HER TO BEGIN WITH TO GET TO EXPEDITE THE LETTER TO GO TO THE ZONING BOARD OF APPEAL SO I WANTED TO MAKE SURE I SAW THE CO AND I DOUBLE CHECKED TO MAKE SURE EVERYTHING ELSE WAS IN ORDER AND IT IS SO SO WHAT WE NEED IS JUST APPROVAL THEN WE CAN MAKE THE APPLICATION FOR THE BUILDING PERMIT ORDER THE ARCHITECTURAL DRAWINGS AND MOVE FORWARD I don't have the reading. Do you have a reading? I believe you have the reading. Do you have the reading? I believe you have it, actually. Okay. So, Mr. Chairman, with respect to appeal number 2026-018, I move that the appeal of Gene Monsey's 54 Cedar Street, Riverhead, Suffolk County tax map number 600-113-2-73 residential B 40 zoning for variances and are relieved from Town Code chapter 301 to 17 where proposed front yard setback is 13.4 foot and minimum required is 50 foot where proposed rear yard setback is 12.1 foot minimum required is 60 foot where proposed side yard a budding side street setback is 5.9 foot minimum required is 50 foot and where the proposed impervious surface coverage is 35% while the maximum allowed is 15% be granted in accordance with the applications and sketches with amendments there too if any as filed with the building inspector second Godzilla, are you on? I see Mr. Godzilla on. Is he on? Godzilla? Okay. Mr. Zaweski. Aye. And I vote aye. Thank you. Good luck. Thank you. Good luck. Have a good night. Okay. So the next appeal is appeal number 20-26-019. It is entitled 645 Grumman Boulevard, LLC, located at 645 Grumman Boulevard in Calverton, Suffolk County Tax Map number 600-141-2-2.1. It is zoned as Natural Resource Protection, and they are looking for an interpretation for parking requirements to an indoor agricultural facility due to Town Code Chapter 301-231A. 31A for reasonable and appropriate off-street parking requirements. All right, Mr. Cuddy, we don't have to swear you in. Welcome. Good evening. Charles Cuddy, 445 Biffing Avenue, Riverhead, New York, for the applicant. This is a site that some of you may be familiar with, but it's sort of off the beaten track because it's in the Grumman area. It's owned by Signature Partners. The principals are here with me tonight, Mr. Frost, Mr. Weiss. The architect, Arthur Rast, is also here. This is a building that's 66,000 square feet. It's on a 20-acre parcel. The parcel was reviewed significantly by the Pine Barren Commission. The Pine Barren Commission on May 20th gave them approval for what is an agricultural and horticultural use at that site. THE SITE ITSELF HAS SIGNIFICANT PARKING BUT THE PROBLEM IS IN GOING TO THE PLANNING BOARD, THE PLANNING BOARD COULDN'T DETERMINE ANY INDEX FOR THE PARKING IN THE COUNTY CODE SO THEY PASSED IT TO YOU THE ZONING BOARD TO MAKE A DETERMINATION AS TO WHAT WOULD BE APPROPRIATE. We believe that we have a number of examples that we can give you. Mr. Weiss is here. He will approach you and give you a handout, which I'm going to actually give you now. Mr. Weiss, if you come up.

Mr. Rice, are you an attorney? no I'm the member of the applicant sir you sell me swear to tell the truth tell truth nothing but the truth so help you got I do please state your name and the address my name is Andrew Weiss jr. I'm the CEO of signature partners and co-managing member of the applicant 645 Grumman Boulevard LLC our office is located at 285 Sills Road in building 2 in Patchogue. We also have an office in Manhattan at 200 Madison Avenue. So we are embarking upon an adaptive reuse of of three existing structures that form 645 Grumman. We are focused on a indoor agricultural use, which is an as of right use in the NPR zone. We are not looking to change the envelope or footprint of any of the structures, and we will keep all the outlying structures as they were constructed over time. Oh, could be. So there is nothing that specifically addresses indoor agriculture within the code in terms of parking. We hired a group called Third Act Architecture and Consulting who are specialists in creating indoor agricultural. you know they design and build spaces for people that are in the indoor agricultural industry that better oh yeah okay you know so our consultants have assisted us in you know putting together parking and employee counts so we can determine how much parking we need in conjunction with the Pine Barrens Joint Planning Commission we there's enough asphalt on this site where there were three approximately three hundred and five parking spaces that were you know built for a very different use it was a you know is an office use primarily that they were created for. So we have reduced the count to approximately 190 spaces and we are going to convert 34,000 feet of what is currently asphalt into green space. The site is 20 acres. 10 of those acres are our pine trees which are going to be preserved we're not going to we're not going to touch those pine trees they will stay just as they are so we agreed to you know reduce our parking town to approximately 196 spaces and we have an additional 15 land bank spaces in case we are to need them in our evaluation of other indoor agricultural uses it was determined that the buildings and Charles was talking about the first building which is building 78 which is phase one of our development this building is in pretty good shape the roof was replaced and this building remains in very good condition the other two buildings did not have replaced roofs so it's kind of been raining inside of those buildings for the last 30 years they're going to need a little bit of work to say the least but we're focused on building 78 and the parking lots that surround building 78 however we have done a parking determination here for the entire site where we feel that the maximum number of employees that will be required will be 120 um you know minimum number you know is 90 you know and that's that's per shift um so we have a you know a substantial buffer uh with the 196 spaces that is that for phase one building 78 you called it excuse me i'm sorry is that calculation based upon operation within building 78 yes that is uh actually a combination of building 7808 and the third building which is a single story uh property total square footage calculation of the buildings you're referring is uh approximately 126 169 square feet and does that reflect total quote the site yes the only thing that number doesn't include are three small outbuildings of each are maybe a couple of hundred feet they're very small and you know we're gonna you know keep them refurbish them we have various uses for them for for example you know storing containers that were have refuse one will be for the gardener and another actually has the electric service for the third building located in that so if you look at the chart that Charles gave you there are several examples here um 645 Grumman is listed as first um the second is actually um there was uh this is van de weathering um for a period of time there was 30 000 feet that was used uh by a company called columbia care where they were doing indoor agriculture using grow lights and they occupied approximately 30 000 feet and they they had 27 employees. Also on Sound Avenue is a company called Flavor Fields that you know that grows plants under lights. Their facility is approximately 45,000 square feet. They have 40 employees they have 60 parking spaces then there's an example in Massachusetts of a hundred and five thousand foot structure it's also used for the same purpose and they have 18 and 18 employees but they have a they have a fair amount of parking they have 70 parking spaces there and a company called uh living greens has two facilities um one of 44 000 feet and one of 200 the 44 000 foot uh property has 50 employees and 50 parking spaces and the 200 000 foot property that they have has a 120 employees with the same number of parking spaces and then we had one additional example on Birch Street in Massachusetts, which was a 26,450-foot building with 18 parking spaces and 18 employees. So all the parking spaces are intended for employees? Yes. There's not going to be any retail strictly wholesale operations and do you need any parking spaces for delivery trucks of yours or deliveries being made there any larger type of parking spaces um you know not that we're aware of we do have room for deliveries there's a there's there's a a lot of pavement around these buildings and um you know there's there's there's ample places for trucks to stop and uh and drop off a good trucks on site essence yes and we have there's a there's a a track that runs around the entire property making it for easy access So on this plan, is there any single loading zone? There is a freight entrance for the 78 building that is a roll door. that I don't have the site plan in front of me, but there's a fair amount of Thank you.

So there's a very wide aisle and there's an interior loading area inside of the building where several i think you could probably fit three or four vans actually inside of the building to be loaded but there's a lot of room to potentially line up trucks that might come in here that um can uh you know go straight out the uh the exit without having to go through any any parking lots or buy any of the cars the building 78 is flanked by two lots there's a there's a front lot and then there's a back lot that is a pretty good size 78 is the one that has the good roof yes okay this area proposed uh 34,843 square feet converted from asphalt. What's proposed in that thatched area? We're thinking of a grass field with some indigenous plantings. We haven't designed that yet. We do show some trees on the perimeter. WHICH IS OUTSIDE OF THAT 34,000 FEET. BUT WE, YOU KNOW, THERE'S A GOOD BUFFER ZONE BETWEEN US AND THE GOLF COURSE. IF YOU'RE LOOKING AT THE PLAN TO YOUR RIGHT IS THE GOLF COURSE. AND, YOU KNOW, THERE ARE A LOT OF TREES THAT WE'RE GOING TO RETAIN THAT ARE ALL OVER THE PROPERTY. but I'm thinking of this as a big grass field with trees and indigenous plantings. It's preserved. Yes.

Just for the record, can I ask you, is there a chance of actually getting this with whoever actually completed the study? What would you like on that, sir? this right here it just it gives us comparable 645 comparable Boulevard I've already forgotten who actually did this for you would it be possible to get it yes I can I can redo this and we can put the name of our consultant in any other data that you would like integrated into that so would you agree that the number of employees and the number of parking could be impacted based upon the number of harvest the amount of automation the growth style the plant density I think the answer is yes but if you look at the numbers we have a minimum and a maximum and the maximum reflects when they're harvesting because they're gonna have extra people there to do that they're gonna harvest they're going to package um and they're going to ship so the um you know it will ebb and flow a little bit but we we the the expected number of employees is is closer to 90 and then it gets to be 120 during those periods

just just to get on the record there's no proposed outside storage or anything else that would cannibalize any of those parking spaces no no outside storage will be i don't don't think it's allowed so under the code when he use is not identified on the parking schedule the code provides one parking space space per 300 feet my correct myself that's correct okay so that number would be over 400 parking spaces correct yes okay would be a lot of parking spaces right so uh

in the presentation to planning board this area of proposed 34,843 square feet converted from asphalt. Was that presented as a landscaped area? And I'll tell you why I'm asking. In every other area on the map, you identify natural green space. here, it almost is worded like it could be converted to a building in the future.

We'll be happy to write in anything you like there. You know, I think this site is... Yes. Well, you know, it's true that, you know, part of our hardship waiver is relegated to that we're not going to increase the footage here. Definitely not going to build another building. And we're going to renovate what exists. WE'RE EVEN LEAVING ALL THE OUT BUILDINGS BECAUSE THEY ADD SOME CHARACTER AND WE WILL USE THEM AS BEST AS WE CAN. BUT WE WOULD BE HAPPY TO WRITE IN THAT THERE'S NOT GOING TO BE A BUILDING SITTING HERE. AND WE WILL, AS WE ADVANCE THIS PLAN, WE WILL BE ABLE TO SHOW YOU EXACTLY WHAT WE WOULD LIKE TO PLANT HERE. NEW SPEAKER. you haven't decided yet what you're going to plant there or use those buildings for well so far we have the grass field um and then we have to you know look at the you know the contour of the land and and and we have to plan exactly you know what would be planted there no not on that land i'm talking about inside the buildings what what is that use going to be used for indoor agricultural use give me an example um there are a lot of uses out there um the uh you know we studied for example on our list here just to give you an idea um flavor fields is microgreens um you know columbia care who used to own van deweathering is no longer in business that was a cannabis use um living greens they actually do what is called aeroponics which is a new one for me and this is primarily done with lettuce and it's it's watered by mist I'm not even sure how they anchor the roots but it's it's it's an aeroponics use and I'm not a hundred percent sure what the other two facilities are but I'll get a definition for you mr. Cuddy I was going through the file you may have submitted it perhaps not to zba but do you have a copy of that grant of hardship thank you yes yes

if you don't oh if you have an extra copy that would be very helpful yes we do great Do you operate any similar, quote, indoor agricultural growing operations or not we do not we we do own a fair amount of medical office space and some industrial space but what we have done is the you know this consultant is helping us to determine you know what these tenants are going to need in terms of a facility so we in doing that we design a facility and we get an idea of the various requirements in terms of lighting electric air conditioning load heating load how the plants are going to be watered we will have probably two large you know outside tanks that sit next to the building that will have fresh water that will be drawn and the plants will be watered with that but the consultants are helping to determine you know what these tenants need so we know how to how to address them if it was a medical tenant we would know exactly what to what to tell them so based upon my research the type of operation has an impact on parking and for the zoning board you're here because this is not an identified use in the parking code So it means it's unique, different, novel. So I think it would be beneficial for the zoning board to have an expert report identifying the type of operation and somebody who is, quote, experienced with traffic and parking analysis. Would you have an objection to submitting that? No. We'd be happy to.

I guess voice my concern with that. It seems to me that this is a site that's remote. virtually from every other place if you've been there. And the parking is quite adequate. It's a question of how many spaces we need. But to go through a whole, essentially, traffic study. I wasn't suggesting traffic study. Somebody who's versed, then if you want to limit it to parking analysis based upon a particular use, that would be good. But the analysis we're giving you is that we're doing this indoor type of activity. And I don't understand how it would change anything somebody could add to it. Well, because I asked your client the question and he answered. Yes, parking can change based upon the type of grow operation on the level of automation, on the number of harvests, on the grow style, plant density. I mean, I'm not an expert at this, but certainly quick research on this, there are experts on it that can do a parking analysis for this type of use.

Okay, we can't add to the parking that we have. We said we have so many spaces, we have so many employees. I'm not sure what all that would establish. I mean you're saying somehow that that would change things. We have so many spaces. We have so many employees, the type of activity that we're doing. In the future, it may change, but not now. They have something that they're working on. I just find that something extra for a place that has a lot of parking has a large building where there's going to be a certain type of use inside. And I just think it's sort of an add-on to ask for that. That's all. But earlier, it was stated that the parking, the number of 205 parking spaces, was intended for all the buildings on site. Not just Stage 1, Building 78, for all. We haven't, we don't have uses for those sites yet, so we won't know. I mean, someday we may have to come back here and say we need more parking, but we don't think so. We think that these spaces will be adequate for the entire site. And that's why I don't understand why we'd be doing this study. Your representation tonight is you're showing us a plant with close to 129,000 square feet. by advocating parking of 205 spaces for building 78 only. Okay. I think we can explain a little bit more. Do you mind? You have to raise your hand. Okay, hold on. It takes me a while to stand up. You're telling me the whole truth, and that's what the truth is, so help you God. I do. I'm Robert Frost. Mr. Weiss's partner same addresses as him. So just to clarify what the Central Pine Barrens Commission approved Okay, so we can't have more than this under their jurisdiction Is 211 spots of which 196 exist or will exist and 15 are land banked So that is the maximum that the Central Pine Barrens will approve for the whole site. We believe that we need 120 ish spots for the entire site not for building 66 for all of it. And that is consistent with the table that we provided you, which shows that in the tightest configuration, it's about one employee per 1,000 square feet. But in many configurations, it's even less than that. It's one employee per 1,500 square feet or something like that. So just to clarify, we believe that we're actually going to be significantly over-parked. We're going to be over-supplied for parking spaces from even the maximum that we would have during a cutting period. I will grant you that you're right. There could be different types of products. Perhaps indoor tomatoes are denser than indoor kale. I don't know. Just to be clear, we're in the real estate business. We are not going to be operating this facility. We're going to be renting this facility. But the order of magnitude difference between one of those products and another does not take us from 120 maximum spots to 240 maximum spots. So I think that's what Mr. Cuddy is getting to, to have a study or a letter that basically gives you these examples and maybe a few more from, it would presumably be from our existing consultant who are well versed in this and can provide their credentials, isn't really going to give you more information than that. is not a well-known or broadly done thing or not millions of indoor facilities we believe based on the consultants that we've hired that the maximum headcount that we will have for the entire site is 120 and that's only during cultivation periods does that clarify well but you're not giving us any detail of why you have that belief that's all we're asking for this yeah is appreciated however there's no detail behind this in other words you're not giving us really examples of exactly what the type of growing or what is on these properties I bet I mean you know would that would that change the view would still be the same number of employees we think greater detail would be beneficial so we would propose if we were to do that that third act architecture and consulting provide that is that an acceptable consultant we have retained third act architecture and consulting to advise us on this project they are well experienced in the development and the construction of indoor agriculture would they be an acceptable consultant and would a letter from them that it provides more detail to you and what I just want to clarify because I don't I want to make sure we deliver what you want what would the report state that would help you in the report would explain number one their qualifications and experience number two what method did they undertake to do the calculation right I mean that's standard in a report how do you go from a to the end but these would be if they were providing this data they didn't necessarily build all these these are other projects but they they could talk about it there's and they could stay based upon review of the site plan and the square footage right okay and the detail that we do know regarding their proposed indoor growing plan and then give us the detail listen if that's what if that's what would give you comfort in terms of having more data we can do that I will say I do think that is a touch repetitive of what we've provided but I understand it that you want it with qualifications we can certainly have them prepare a report with their qualifications provide you with examples but I do want to be clear there aren't they are not going to have calculations in it they are going to provide you with examples of other facilities that have been developed they will state what which are not in this jurisdiction. They will state what was being grown in that facility. They will state how many employees, to the best of their knowledge, from public records there are, and how much parking was provided. If that is the detail that you need from them, we can probably ask them to do it. They may not have 50 examples. It may be 10 examples or five examples. I think to the extent that they could weigh in, to the extent that they have it, on the degree of, let's say, mechanization or automation, right? Because I'm assuming that there could be different stuff there. I think with what you mentioned, with something along those lines, at least for me personally, that would be more than fine. I will tell you that our concern originally in coming here was that you would actually reduce the parking further because the central pine barrens reduced the parking. So our concern is we want to keep the parking that we've been reduced to not that we're trying to minimize further right, that's why we're happy to have all these extra spaces because You know One day there may be trucks there. I don't know. That's not the original plan that they you know There's somebody might park their truck there. Excuse me when you went to the Pine Barrens was there a record of that? Yes, we've given it. Do we have that we have?

the minutes right so our problem that's what we need to do our process was we originally want we bought this building in november of 2025 this property we immediately went to planning planning said you were in the central pine barrens area you need to go to them for a determination we went to them they were established that they would be the lead agency by the town and by others we then went through the central pine barrens process and they granted us a hardship waiver on May 20th of 26. That hardship waiver was based on a site plan. It's the same site plan, materially the same site plan that you've seen. We then went back to planning, and planning sent us here. So planning has, we have not proposed to planning anything about that planted area other than it's a planted area, because we haven't gotten into that part of the process yet. So has the planning department or the planning board, Have they questioned you as to what you intend to raise inside the buildings? Other than agriculture, I don't think so. Tomatoes and cannabis are two different things that run very quickly. Well, it could be cannabis. Shop up the money on it. It's going to be cannabis. It absolutely could be cannabis. You as the landlord, are you going to retrofit those buildings and mechanize everything inside the buildings, or are you just going to lease it and let them do the work? We are doing a certain amount of work. We have to make those buildings rentable. We have to clean them up. We have to – Put the roofs on, yada, yada, yada. And then presumably the tenants will build them out. And then they'll come in and do the interior structure and mechanisms to deal with what they're going to raise. Correct. And the reason we brought in Third Act was to advise us on what would a typical tenant in various different types of agriculture look like in that scenario. Well, my guess is that cannabis is the most profitable. Yes, listen. And that's what they would come to you for, to rent. And I know you guys are working really hard to avoid using that word. I'm not actually trying to avoid it. Because there will be interference probably from the public. I don't know. But I do know that it's a different kind of business. I will say this. We are not trying to avoid that conversation at all. I understand you're prepared to deal with it. No, no. And we are capitalists, right? We buy stuff to make money on it. Gotcha. But I would highlight something that makes this site very different. The first is this site is already zoned for a natural resource in the natural resource protection zone, which permits agriculture as of right. The second thing is we are nowhere near any homes. The closest home to the north is almost two miles away. The closest home to the east is 2.3 miles away. The closest home to the west is 1.4 miles away. And the closest home to the south is about two-thirds of a mile away through a forest. We are not proposing an agricultural building, whether it's cannabis or tomatoes, anywhere near anybody's home. This is an old industrial building in an old industrial area near nobody's home. And so I do think, since the town of Riverhead does permit these uses and has opted in, that this space is consistent with that intent. opposed to are we recognize that not every applicant here is necessarily always consistent with that and have made other suggestions so we're happy to comply with whatever you want in order to make those decisions I do think we are materially different in in some pretty core ways and yes I mean people are entitled to object that's the democratic process of course but you know we want to comply with what you want so we can now withstanding the fact that we may find it a touch repetitive we understand the process and you need to have the record right so we'll get you that letter and we will have the we will have our consultant establish their credentials in that letter Charles when do you think we could get that like they try to ask you what's the next state you want it on for I mean I think they have all the data I don't know that they're professional report writers of this nature so I think we can have it in a matter of weeks as opposed to a matter of months I would hope to have it for before the event to 30 days 30 that's fine so I mean the next meeting is October 22nd and I just put the new things and there was only two on for that so it's totally up to you at this point I would anticipate the way would have it you well before I'll cover sir how do you gonna be here anyway I'm a 22nd I am isn't he always here do I have to be does that work the 20s hope that they can have it that time sure yeah we can I mean if you needed extra time simply contact Marissa did you want me to put it to the November date I would rather it for the October date because we're on April and they think they can have an October. Okay, great. Yeah. It's not they have the death. It's a question of them having the grammar. Thank you. Is anyone in the audience wants to speak on this subject? Anyone? Anyone on zoom? Nobody on Zoom. Okay. Motion to adjourn until October 22nd. Second. All right. Move to second it. Mr. Zawieski. Aye. Mr. Barnes. Aye. And I vote aye. So we'll see you on October 22nd. Thank you. Anything else, Marissa, that we have? How about meeting notes or anything like that? I do not have any meeting minutes at this time. So I'm hoping maybe by the next meeting I'll have some minutes. No, I'm just going to, Marissa, ask you to make this part of the record, the Pine Barrens Commission, and circulate to all zoning board members. You can email it. Thank you. Okay. If there's nothing else, can I have a motion to adjourn? Motion to adjourn. And close our meeting. All in favor? Aye. We all voted aye, so... It's aye-aye.