The Zoning Board of Appeals granted extensions and variances for several Riverhead properties, approved a gym project on Route 25A in Wading River with modified driveway access conditions, and deemed two applications abandoned due to lack of applicant response.
Key actions
- The board granted a one-year extension (to November 13, 2027) for an appeal at 7 Warner Court, Calverton.
- An adjournment to February 25 was granted for the Lincoln Street Opportunity Zone Fund LLC appeal.
- A final adjournment with a January 14, 2027 hearing date was set for an appeal at 178 Main Road, Riverhead (Maria Salguero), with required survey and denial-letter documents due by December 14, 2026 or the application will be deemed abandoned.
- The board approved variances for a proposed two-story gym building at Route 25A, Wading River (Three Diamonds Property), including front yard depth, landscape buffer, and driveway access relief, with the applicant agreeing to make the Debbie Lane access ingress-only and keep North Country Road access as ingress/egress, plus conditions on landscape buffering around the outdoor exercise area.
- The board granted a front yard setback variance for a covered porch addition at 40 Nautical Drive, Riverhead.
- A decision on reopening special exceptions for an antique/classic car restoration business at 1500 West Main Street (Phase One Auto Body) was reserved for December 10, pending conditions requiring planning and building staff approval of screened outdoor storage.
- An appeal for a property at 413 Craderville Avenue was formally deemed abandoned due to the applicant's failure to provide required documentation after multiple adjournments, with no refund of fees.
- Two previously reserved decisions (Sweezy Avenue and Route 25A, Wading River appeals) were postponed to December 10 due to town computer problems.
Public hearings & comment
- At the Three Diamonds Property hearing, board members questioned whether the building size and outdoor turf/training area could be reduced to lessen the need for setback variances; the applicant and engineer argued the lot's unique triangular, three-front-yard configuration limited design options.
- The highway superintendent recommended the Debbie Lane access be ingress-only and the North Country Road access be egress-only, while the fire marshal had supported two full ingress/egress points; the applicant proposed a compromise of ingress-only on Debbie Lane and full ingress/egress on North Country Road, which the board accepted.
- At the Phase One Auto Body hearing, the property owner and operator described current and proposed restoration operations, outdoor storage needs for vehicle parts and equipment, noise/dust mitigation measures, and site buffering from neighboring properties.
Auto-generated from an unofficial, machine-made transcript. It may misstate names, figures, or votes. Verify against the agenda and the full transcript below.
Full Transcript
Thank you.
All right. Good evening, everyone, and welcome to the Zoning Board of Appeals meeting for Thursday, November 12, 2026. So, who's got the agenda? Pledge of Allegiance. Oh, thank you.
I pledge allegiance to the flag of the United States of America and to the republic for which it stands, one nation, under God, indivisible, with liberty and justice for all. Mr. Chairman, if it would be all right, I'm going to start reading through the agenda. We have three hearings on, so I'm going to go through some preliminary stuff fast. Okay. Extension requests. Appeal number 2023-051, Mark Lamania, 131 West Main Street, Riverhead, New York. At the last zoning board meeting, the zoning board granted a totality of three extensions. The record should be corrected that the applicant did receive the first two extensions in 2025, and only one was needed. So, Marissa, I want a copy of this transcript annexed to that. Next, appeal number 2025-39, 7 Warner Court, Calverton. This matter was originally granted November 13, 2025, with an expiration date of November 13, 2026. Applicant requests a one-year extension expiring November 13, 2027. Vote, please. So moved. All right. Mr. Barnes? Aye. Mr. Prashetta? Aye. Mr. Weske? Aye. And I vote aye. So the extension has been granted. Next, as to the two reserved decisions, appeal number 2026020 Sweezy Avenue and appeal number 2026-21-5284, Route 25A, Wading River. Due to computer problems at the town, and I hear across the nation, those reserve decisions will be set for December 10th. Both of them, right? Both. Okay. Next, as to adjournments, appeal number 2025-028505, Lincoln Street Opportunity Zone Fund, LLC. The attorney for the applicant came in and requested February 25th adjournment. Motion? So moved. Mr. Barnes? Aye. Mr. Parcells? Aye. Mr. Zawieski? Aye. And I vote aye. are those have been granted next appeal number 2026-002 maria salguera 178 main road aqua box suffolk county tax map number 600-85-2-2 rural corridor legalized amendment of addition to dwelling uh this matter was adjourned from april 23rd 2026 as we have not heard from applicant we would like to do a final adjournment with a decision please okay mr chairman and the rest of the board with respect to appeal number 2026-002. I moved at the appeal of Maria Salguero, 178 Main Road, Riverhead, STM number 600-85.2-2, Rural Corridor RLC Zoning. For variances and or relief from Town Code, Chapter 301-9A, Subsection 1C, where rear yard setback is 3.3 feet, the minimum required is 20 feet. And Chapter 301-11, where lot coverage is 21.55%, maximum allowed is 15%, District B. This matter was originally scheduled before the Zoning Board of Appeals on February 26, 2026. At the hearing, it was determined that the impervious surface was to be revised and to get answers for the Zoning Board members, the applicant requested an adjournment date of March 26, 2026. At the March 26th meeting, this case was adjourned to April 23rd, 2026, to allow reissuance of a denial letter to include the amended relief and renoticing and posting fee. At the April 23rd meeting, this appeal was further adjourned to a later date and renoticed. As of July 16, 2026, a note in the appeal file stated, no response to date from applicant slash design professional, both planning and building contacted. No updated denial letter. House is now for sale. Further, planning staff reached out in October of 2026 to the design professional requesting status with no response. This shall serve as a final adjournment with a hearing date of January 14th, 2026 at 6 p.m. and direction for the applicant to submit an updated survey and secure an updated submission of denial letter from the building department. Together with re-noticing fee to be submitted no later than December 14th, 2026 to the Town of Riverhead Planning Department to meet the filing deadline. for the january 14th 2027 meeting the failure to submit documentation here and with within the time parameters above shall be deemed an abandonment of the application for relief and forfeiture of all the applicable and related fees so moved second second okay mr barnes hi hi
That brings us to our first public hearing of the evening. Appeal number 2026-022, Three Diamonds Property, Route 25A, Wading River, Sub-County Tax Map number 675-1-10, Multifamily Residential Professional Office Zoning, Proposed Two-Story Building with Associated Site Improvement. Applicant requests variance and or relief from Town Code Chapter 301-73C1, where front yard depth is 25 feet along North Country Road and Debbie Lane, and the minimum required is 50 feet. We leave from Chapter 301-74A, where the front yard landscape buffer is 25 feet and the minimum required is 35 feet. And finally, Chapter 301-75B, where there are two proposed driveway access to the subject property and the maximum quality of driveway access per lot is one. Mr. Chairman, members of the board, good evening. Steven Losquadro on behalf of the applicant, Three Diamond Properties, LLC. The applicant proposes the construction of a commercial building requiring certain variances, as were just listed by Ms. Prudente. The building will be a gym. That is what is proposed. As was mentioned, there's a front yard depth variance of 25 feet where 50 is required. There's a front yard landscape buffer of 25 feet where 35 is required. And then there are two proposed points of driveway access where one is permitted. Initially, let me please respectfully submit to the board that each of the variances are reasonable and relatively minor under the circumstances that surround this matter, which we can talk about briefly. There are several points to consider, and I'll note that those points also were spelled out in the applicant's written application to this Board of Appeals. The variances would not cause an impact on adjacent properties or the immediate neighborhood because the parcel is surrounded by three roads, and the only adjacent lot is a gas station. There are no nearby residences at all. Across North Country Road to the north is a nursery, and then across Debbie Lane, which then goes to the west, there's an office-slash-medical park. The variances are not substantial, And that is particularly due to the unique configuration of the parcel, which has three front yards. The benefit for the approval of the variances, if you would, would not and could not be achieved alternatively. And that, again, is due to the very particular and unique configuration of this parcel, which, again, is very oddly and uniquely shaped and has three front yards. Further, as is listed and set forth in the application, the variances would not cause an adverse effect on the environment, not only because an IA septic system would be used in this instance, but proper drainage would also be imposed by way of approvals that would come through the planning department. Further, I should note that on August 20th of this year, there was a negative declaration issue pursuant to SECRA, which found that the proposed action is not expected to have a negative impact at all on the environment. Finally, the difficulty here, as such, is not self-created because, again, we have to look at the unique configuration of the parcel, which causes the variances here to be sought. Addressing those more specifically, I would note for the record as follows. The matter of the front yard depth and the landscape buffer is really solely due to the configuration of this particular parcel, which converges in an odd way and then has three front yards, which again, the nature of the three front yards and the configuration causes the variances here to have to be sought. Finally, with respect to the two driveways that are requested, that's requested to create a better traffic flow within the particular parcel and also to promote safety considerations so that there are two points of egress and ingress. I have been informed that there was a meeting that the applicant and the applicant's engineer attended at which the fire marshal attended as well and that those matters were brought to the forefront and it was agreed that the two driveways would better serve public safety considerations members of the board that concludes my application and my presentation with respect to the three variances so I will notice follows your consideration and if you would like to to hear from anyone else that the projects and the applicants engineer is present the applicant herself is present and also the design professional who worked with the engineer to bring forth the plan that was first brought to the planning department that was vetted there and then ultimately brought to this board all of this individuals are present and my final comment would be that throughout this process the applicant and her representatives particularly the engineer and the design professional, have worked very collaboratively with town staff to bring forward the application that you are considering now. And of course, I'm happy to answer any questions or to bring forth those who may be able to answer them better than I could.
Can you talk a little bit about, there's like an outside area.
I don't know if it's an outside part of the gym. Turf area. What's that going to be? Can you talk a little bit about that? Yes, I'm going to actually have our engineer place his name on the record and let him address that specific point for you. Okay. That's Matthew Aylward, A-Y-L-W-A-R-D. What's that? Lawyer? No. Engineer. Raise your hand. I do solemnly swear to tell the truth, tell the truth, nothing but the truth. So I'll have you go ahead and state your name and address. Matthew Elward, R&M Engineering. Last name is A-Y-L-W-A-R-D. And address is 50 Elm Street in Huntington. The outdoor area is an extension of the workout space. So on a nice day, the workouts will take place in that outside area. so is there going to be like equipment out there what is it going to consist of there'll be some um like phylac just for like a tire like you know like they lift the tires and all that stuff so something like that but most of the equipment will be stored inside it'll just be stuff that kind of stays outside and is that that area fenced into the put like is it is it surrounded by a fence and i know there's a there's a bit of landscaping that yes it's fenced in surrounds it on the edges. Yes, it's a very fenced in, and there's still that 25-foot buffer between the fence and the property line. And there's garage doors on that side? Yes. How many? I believe there's just one.
So could you explain a little bit more how this isn't a self-created issue? You know, we've got the size of the building, location on the lot. I'm just I haven't heard anything other than we want to have it there that kind of explains why it's not self-created Because the parcels unique in the sense that it's I understand the parcel Yeah, I can see see what's on the map there I guess my question is you can't locate the building any place where you don't need that or you can't make the building smaller
There's really no place to put the building because all the setbacks are 50 feet So if we follow the 50-foot setbacks on all three sides, we're reduced to this triangle of about 19,000 square feet. 19,000 square feet of a usable 1.29-acre parcel. So that's the problem. Once you take that building and you place that building in the middle, in the center of that, what creates like a triangle, which would really be this way, with Debbie on the left, your right, it puts the building right in the middle. And then it just doesn't function because now all of a sudden there's no way to get parking and drive access for that parking. Okay. And size-wise, it has to be close to 8,000 square foot, 7,800 footprint? Yeah, to function and for this investment, yes. He has such a demand that he needs this space in order for his classes, for his training, for people to be able to come, work out, and then kind of, I guess, decompress. I don't work out, but it's to decompress after the workouts, kind of like let your body kind of heal. What kind of gym is this? Is this just like a regular weightlifting weights? No. The gentleman that runs the gym is here, if you'd like to ask him. It's more of like a CrossFit. I know he's probably going to say, no, it's not CrossFit. Hydrox, I think, is probably a term I think I've heard. But it's something like that. It's not someplace where you come. It's not a Planet Fitness or one of those where you come and you work out on your own. You have a specific time frame with Matt, and he sets up your schedule and goes through each phase and each zone with you. What's on the second floor? Second floor. I don't have that plan with me.
The second floor consists of a sauna with red light therapy. There's a separate room at red light therapy. there's a break room, a consultation room, and then the owner's office. And so all the workouts, yes, if I'm not mistaken, all the workout is done on the first floor, and then you come upstairs, there's a recovery room, there's that, like I said, the sauna, the red light therapy for all recoveries. Treatment room. for the record the application that was submitted on behalf of this application noted it was a self-created hardship due to the size of the structure and the lot configuration just for the record I would disagree with that it's the part it's a 1.29 acre parcel that's owned I believe the minimum lot size in this zone is well I'm just I'm reading from the application that was filed with the zoning board question is Is there any way that outdoor area could be reconfigured and less square footage? Rather than 1,700 plus or minus square feet, could you reconfigure it to 1,000 square feet, quote, giving the greater landscape buffer closer at least on the one side. I understand the argument that you're making regarding the configuration of the parcel. And so it likely would be very difficult because this parcel has three front yards. to accomplish that but if that outdoor area you already have 8,000 square feet indoors if you could reduce that outdoor area to let's say a thousand square feet you could increase and closer meet the landscape you know that's not a decision that I can make. Matt, you want to come up? I would point out that just, well, Matt's on his way. The North Country Road and the Debbie Lane, those setbacks are still set by the building itself. And that turf area kind of creates that triangle where it's the projection of the 25s continuing on to the intersection. Okay. You saw me swear, tell truth, tell truth, nothing but the truth, say help to God. Please state your name and address. So Matthew Esrich, that's E-S-C-H-R-I-C-H, and it's 3 Constant Court, Rocky Point, New York. Could you just project your voice a little more? I can. So pertaining to the outdoor area, what we tried to do in general was because we asking for 25 all around because of the parcel now I know you guys know but MRP is owned for four acres this is 1.29 so we're asking for 10 feet in and that's it the outdoor space that 25 feet is what we're asking all around where we're getting 35 in the front but the two sides we're just asking for uniformity all the way around that's it we already shrunk it but we're also putting mechanical out there in that outdoor area and enclosing it in as well but if you shrunk it at least on one of the front yards you would be closer to the code requirement true i understand your logic is oh keep it uniform all the way around the building but the code is is about the distance. The outdoor space isn't like a daily use thing. Part of it is when we do events and stuff like that, we need it to be large enough that we can have a bunch of people out there. So my main room is only like 3,000 square feet. Then I have other spaces throughout there. We have another room and the reception area, but our main training area is only three in this section here. So that's just an extension when we get to do it or we host events, we need a big enough area that we don't have to I don't know, worry about going out into our parking lot and things like that where we have to put tables and stuff for people. So we're trying to have an area for special events. Like when we host them, we did a breast cancer fundraiser recently, and we were packed to the gills where we were, and we envisioned that where we have our overhang and we can put tables and stuff out there. And like I said, it's all fenced in. Like I said, we did shrink it already once as per planning's recommendation. So we did shrink it in to that 25-foot ask. I would request that we kind of get that or we do get it because I don't really think we're asking for that much We're only asking if it was a two acre property This would be simple, but it's not it's 1.29 as a Dorito and we have three fronts Which is kind of unheard of so with that that's the only issue why we're asking To go back to yeah, good. All right, that's it. Unless there's anything you own another gym I'm assuming somewhere else so I am the head coach in another place I've been working on my own space for a few years now and a few places have fallen through I Love the area and when I finally saw it for sale sign go over the property We jumped over and we've been doing the process ever since So even before we met with planning my wife and I did our due diligence on what could fit where we knew a tiny building With four parking spots can fit based on the configuration of the lot with the MRP zoning So that's why we were asking for it was and also the parking requirements, right? So make sure the side stalls, everything's there, and that's why we're asking for what we are. Again, going to the outside space, it's really mostly going to be used whenever, maybe a Saturday, and or when we have events. It isn't closed in, but I would like to try and keep it as much as possible, because the more I shrink it, the less I could have for people to have a good time, enjoyment. It's not like with parties. It's just a place to train. Also, I could do my maintenance on my equipment out there, out of the way, so people could do classes. I could do work out there as well. Marissa, did we get any reports from the highway superintendent on the ingress and egress? Yes, we did. Let me just pull it up. I believe the highway superintendent did send correspondence to the planning department in regards to the accesses as there's two access points proposed on the site plan. And the highway superintendent actually, he made the recommendation of saying that he agrees with the access point on Debbie Lane. However, he wanted it to be an ingress only. And then he also noted that that access point that is on North Country Road to be the egress only. so he was for two off Debbie he wanted ingress only off North Country Road he wanted egress only so it was still there like it's still a variance uh required because it's two curb cuts However, the highway superintendent was pleased with this. However, he stated that he wanted one to be ingress and the other one to be egress. Which was contradictory to what the fire marshal had said at the planning board meeting. Please speak on the podium. Which was contradictory to what was said by the fire marshal. where he liked the fact that the two access were ingress and egress.
Well, part of the issue with that is it doesn't meet code. Second, I'm trying to quick go through the planning staff report. But if anybody else has anything. Just a general statement, but I'm not in the gym business, but I'm assuming that your client, you need a certain amount of square feet to run a successful gym of this nature, right? Yes. I would think if it hit a certain amount of square feet, the gym just couldn't perform the functions that you want to perform there. I'll make clear for the record. I guess what I'm getting into before you make the statement. Yes, that this is what's proposed is what's commercially viable. In other words, everything here that's proposed was thought out, taking into account the marketplace, taking into account what people will want and expect. So, in other words, my client who has explained to you that he has significant experience in this business and industry has made these requests and has planned this out accordingly so that it will be commercially viable. because what we all want and what we never want to see, conversely, is that somebody brings forward something that then can't succeed. So this is designed with that in mind. I guess one of the issues that was going through my mind when everybody was talking was, and I think the board has also thought about it, is that the corner of the property that has the outside area and the reduced setbacks, I don't know the internal configuration of the building, but I guess one of the concerns we have is, like, is there any areas of the building that are not necessary, that maybe if you shrunk the building a little bit, then you could have – pull in the outdoor area a little bit, and maybe there wouldn't be, you know, a reduced buffer. But I don't know what the configuration of the building is, and I don't know if every inch of it is being used. Like, I guess, is there any – is there any fat on the – on the building that can be trimmed? is there any unnecessary space is there any you know I don't know what's going on inside that floor plan what I'd like to do is let my client speak to that because again he's the expert in this business and also he together with the design professionals have put all the thought in for as you've heard for quite some time so I'll let him address that when we started to design this in general we tried to make sure and we did that the building size fits all the criteria based on MRP and what the property allows so we made sure we were underneath what our building size so we fit well if you go through all the details we also did not over design it I went with the bare minimum I need in order to host the amount of people per class to have the revenue coming in for it to be successful if it was up to me the building would be 15,000 square feet but it cannot work on that property does not working that would be a self-imposed problem right not trying to do that I'm just asking for we worked very diligently to make sure the minimum size I need to function and do well even with the parking make sure everything meets criteria even putting in for the electric vehicles we have we're ready for that I don't have anything I could really trim and if I do it's gonna hurt the business model and I guess one other question would be that's your answer that's fine but um is there any way to reconfigure the shape of the building so this way you didn't have like you had the 35 feet that you need on the corner is it can you play with the shape and then play with the parking lot a little bit so it so it fits so if you if you already went down this rabbit hole between our engineers and the architects like before even met with planning we spent a month designing different styles and placements building to whatever I I assure you this is what we're asking for because it's what we need and it's what fits. I couldn't really change anything. I'd have to give up a big part of the business, which then makes it, I don't know if we go in, if I have to lose too much because do we have the revenue to come in and support the place and pay for it? And that's the truth. Nothing more than that. I'm in a space right now that's building 7,500 square feet on the main floor, and I'm asking for just about the same thing on the main floor, and I wanted a place for people that have recovery and things like that. Because that's the biggest trend. Not trend like it's going away, but that's where everyone's going is longevity and health, right? So I wanted to include that in the business model, and that's why we put the upstairs. So we have a section for them. When they're done, they can go, they can get treatment, they can do a hot and cold punch, and there's like a lounge area for people to hang out at. But it's not taking up space that we can get rid of. Otherwise I would if it was unnecessary. Listen, I've had many a sleepless night trying to figure out what works, what doesn't. But I can tell you this has been a work for like three years. For three years trying to design a business model that's going to work. And then we finally came together and figured out this is the minimum. Because I was, he'll tell you, I asked for more. And I know we just couldn't do it. It's going to be too much of an ask. And when you say recover, you're talking about recovery from the workout, right? Yeah, so recovery. So basically, let's say you're having a hard day at work. There's compression boots and massage guns. so people can stop in. Like this sauna, this cold punch, this red light, it's great for the body. There's a lot of stuff behind it. But that is a big part of where all the businesses are going, and I wanted to be the one, to be honest, that brought it to the area of Wading River. I really like that area. There's nothing like it at the moment, and that's why we're doing it. So why did you pick a lot with this configuration and size, knowing you had a business model in your head that didn't fit within the code parameters on the lot. So when you picked the lot and do the thing, until we went planning, we didn't know there's three fronts. We weren't told there's three fronts. We assumed one front and two sides. With two sides, you get 25 feet to the buffer, and that's what we're asking for. But it's being treated as it's three fronts, which on paper it is. So when we picked it at 1.29 acres, everything fits per your requirements through the town, through planning. The size of the building, the height of the building, we're well under. Even like previously in the parking lot, we met criteria and everything. We're only asking for the setbacks in the driveway, which was for safety and traffic concerns. So that was also the fire marshal was here that day and said, yeah, I want that. It makes sense. It's needed. Also, too, it's a lot that has three frontages. It's a triangle lot. And the zoning of it isn't really conducive to, I want to say, any development. the minimum zone the minimum lot size for this zone is four acres this is only one point two nine so you know in you know from a planning perspective it's almost that it was inaccurately zoned but it was purchased correct I mean so I probably would never told there's three funds when the purchase we had no idea about three fronts until we got into with planning when we met with planning and they went over the property with us and said hey you have three funds here's your requirements we wouldn't have known that unless we met with planning and we wouldn't meet with planning unless we owned a property next i'm reading directly from the planning staff report additionally planning staff makes the recommendation that the proposed curb access on Debbie Lane to be ingress only due to concerns of traffic queuing exiting Debbie Lane onto Route 25. In addition, just for the record, planning staff also notes under Riverhead Fire Marshal the subject application was referred to riverhead fire marshal's office on july 29th 2026 no comments have been received to date i don't have an answer for that the fire marshal was here that day yeah yeah
now i'm miss prudente i i think well that could cut both ways but i think i think what we see here is that with respect to the driveways there is a recommendation that there be two so I think the board could act with respect to that because ultimately it would be planning that might decide whether there's egress or or whether there's ingress and egress in one or the other or both in other words I don't think the board here if it's deciding two driveways would would make the determination as to ingress and egress or both I think that might revert to planning but it does seem that there is an acknowledgement that the two are appropriate and maybe in the interim as it's going to be ultimately decided by planning since the fire marshal has not weighed in it might behoove everyone to have the fire marshal weigh in I understand that's your point of view but it is within the purview of the zoning board to quote limit it to one or perhaps grant two with the condition it's certainly within the board's purpose I understand you might want to prefer it not to be before the zoning board but you're here no I understand it it's certainly within the board's purview but if the board might consider it more prudent potentially to wait to see what the fire marshal says in that regard while acknowledging that the two are called for even by planning it would just be the nature of what the driveways permit
I don't think there's grounds to restrict this. There's no. So what? They're having an animal size. No. Ingress.
And all of the. What?
Right. I said good. What? Okay. Mr. Chairman, I know our engineer wanted to add one point with respect to what might be, in his mind, a compromise with respect to the driveway issue that we've been discussing. Go right ahead. Okay. We believe that the property needs to have at least two points of ingress, right, just for safety concerns. There's this 25-foot buffer that goes around the property, So the fire access needs to get in if there's one of the accesses closed. So speaking to the operator, the owner, it would be okay for it to be ingress only on Debbie, but then dual access on North Country. That's what we talked about, right? We spoke too soon. They were going to come back with something else. So are you offering that? Yes. Well, thank you for proposing that. Anything further? We have no further questions. Anybody else want to talk? Anybody out there want to speak? Anybody on Zoom? Mr. Barr, are you okay out there? I'm okay, I'm listening. Thank you. How can we get it done tonight? How can I get it done tonight? Do you want to do it off the floor or do you want to reserve? I'll do whatever you want. We can do it off the floor, can't we? I'm going to read it my way, correct? Do you guys object to speak up? As to appeal number 2026022, Three Diamonds Property, Route 25A, Wading River, Sub-County Tax Map number 675-1-10, Multifamily Residential Professional Office, zoning proposed two-story building with associated site improvements. As to applicants' requests for variance and or relief from Town Code 301-73C1, where front yard depth is 25 and the minimum required is 50 feet, relief from 301-74A, where the front yard landscape buffer is 25 feet and the minimum required is 35. And finally, 301-75B, where there are two proposed driveway access, where the maximum permitted per lot is one, with the offered modification that'll be ingress only on Debbie Lane and ingress and egress permitted on North Country Road be granted subject to I think we should all have a condition. I have no solution. It's in the sense that we all have to look at that. Okay.
Subject to the offer of mitigation and subject to landscape buffering to the extent it could be natural, or if not you'll work with planning staff to buffer around the outdoor exercise gym area so it's not visible from any portions of any roadways and in accordance with all planning board and secret required approvals is there a motion I move to approve second mr. Barnes hi mr. Porsche hi so whiskey I'm giving an eye I just wanted to be on the record that's It's due to the very unique circumstances of that piece of property. It's a triangle. I understand what's going on there. Not purchasing the property and not knowing what was going to happen, that's on you. I don't think we're in partnership with you on that. But given the very unique parcel, you have my aye. I vote aye. So good luck with the appearance. Make us proud. Thank you, sir. Congratulations. Thank you all. Good luck. Good luck with the new gym. Next hearing, appeal number 2026023, John Caradayas, 40 Nautical Drive, Riverhead, Suffolk County, tax map number 614129, Residence RA40 zoning proposed from porch. Applicant requests variances and or relief from town code chapter 301-11, where proposed front yard setback is 9.4 feet and the minimum required is 50 feet. Hello. Please raise your right hand. I do solemnly swear to tell the truth, the whole truth, nothing but the truth, so help me God. I do. Please state your name and address. John Cook, 20 Sandalwood Lane, Riverhead, New York. Go right ahead. I'm here representing my client. My company is Sublime Contracting. We've been hired to basically build a covered front porch for the client. They currently have a masonry staircase with landing. We're looking to expand that and cover it. basically everything in reeves park requires a variance because they changed the zoning there back in the day and that's pretty much the gist of it we're just looking to add a covered porch covered not enclosed just covered thank you yeah is the i i'm sorry i looked at it i know what's going on there is it a masonry uh floor or is it going to be a deck or something so right it's currently a masonry stoop that they had constructed a few years back we're going to pull the top landing off and turn that into a wood framed structure extending about another seven feet to the corner of the house to make it a larger landing okay expanding it lengthwise lengthwise east to west right not towards the road so have you been out to the site the property Yes, so the existing structure that's there won't allow us to add three columns to support the roof without protruding out another foot to the south, which is why we need the variance. If we could have kept it to the same dimensions, we wouldn't have needed a variance, but it needs to be a foot wider in order to make it work.
Is there anyone in the audience that would like to speak on this? No? Anybody on Zoom? I don't have anyone on Zoom. Okay. Who's got this? What do you call it?
Yeah, just. I can take it. Great. From here. So, Mr. Chairman, with respect to appeal number 2026-023, John Karadias at 40 Nautical Drive, Riverhead, New York, Suffolk County Tax Map number 600-14-1-29. Residence R.A. Zoning, where the proposed front porch applicant requests variances and or relief from Town Code 301, where the proposed front setback is 9.4 and the minimum required is 50, be granted in accordance with the plan submitted. I think that's it. I second. Moving on to the second. Mr. Barnes. Aye. Mr. Portia. Aye. Mrs. Weske. Aye. And I vote aye. So your variance has been granted. Good luck. Thank you. That was nice and easy compared to the last one. Thanks. Have a good day. Take care. Our last hearing, just a heads up, we have a decision after the hearing, but the last hearing is appeal number 2026025 phase one auto body 1500 west main street riverhead south county tax map number 600 119 2 lot 7.1 river for riverfront corridor zoning request to reopen prior appeals zba case numbers uh 2011-03 and 2014-18
the applicant is seeking a special exception requesting permission to convert a pre-existing non-conforming builders trade workshop to a non-conforming uh sorry for variances requesting permission to convert the pre-existing non-conforming building trade workshop used to an antique classic car restoration with outdoor storage of motor vehicle parts parts
equipment final uh relief request to reopen special exception for antique car restoration use with limited outdoor storage the way this was worded i apologize to everybody it was worded outdoor storage of motor vehicles and personal property you would never get relief for personal property if you're operating the business the outdoor storage must be related specifically to the business that you're operating do i have an agreement on that yes okay so if you'd like to approach the microphone whomever come right up to the mic and you'll be sworn in please raise your right hand you saw him he swore tell the truth nothing but the truth so help you God please state your name and address Salvatore Caligiuri 10 Muffins Meadow road out of the harbor St. James New York I'm just gonna ask you to project your voice a little stronger the mics are in the ceiling all right are you the owner of the property and how long have you on the property about 12 years okay So during the first application to the Zoning Board of Appeals in 2011, did you own the property? Yes. Okay. And when you made that application in 2011, what was the property, what relief, if you remember, were you seeking from the zoning board? it was pretty much the same thing to be able to do repairs on uh painting and repairs on vintage and custom mortars okay and in 2014 did you all uh yeah 2014 did you make a second application to the zoning board of appeals Well, I would use the next benign of Vic Presinowski. I got the papers from him. Here's how thick it is. He's been on and on and on with this for years. So I don't know the exact dates of why I'd have to go through everything. Right. And isn't it correct that the reason why you've made this application to reopen those approvals is because the certificate of occupancy process, having received not one but two grants from the Zoning Board of Appeals, you never, quote, completed the process in a timely manner such that in order to secure a certificate of occupancy at this point and approval from the building department they're requiring you to come back to the zoning board true okay so that's why you're here uh so describe to me the current use now is that your uh relative that's my cousin your cousin so would you like to come up and just describe how you're using the property okay please raise your right hand i do solemnly swear to tell the truth the whole truth nothing but the truth so help you god please state your name and address anthony caligiore and 12 old selden stage road in selden new york okay anthony respond uh so we're looking to basically make that place a restoration a little restoration place where people can bring you know their prized possessions back to life um there's not a lot of people in the area that want to get involved in stuff like that and uh after hearing stories over the years of people it's their you know parents cars or the grandparents cars and stuff like that and i just want to give people opportunity to be able to restore these things back to life and uh you know and also you know have a family business that i'll pass down to my kids one day um so back in 2011 and 2014 did you have outdoor storage on the property
Yes, I do. Okay. And does this application seek to add to the zoning relief, right, the special exception, to have limited outdoor storage for vehicle parts, vehicle equipment, you know, the type of things that go into the vehicles? When you say outdoor storage, is that also storage in, say, a truck body or a container type thing? Is that still outdoor? I'm not clear on that. Yes. It is? Yes. All right. It would be the storage of parts for the cars that are being worked on, storage for equipment to maintain the property. That's pretty much it. Okay. And does that also include vehicle storage? Like if you're working on cars and stuff like that and it's not ready to go out, is that also included in that? Well, you know, you have to describe to us, you're repairing these vehicles inside, correct? Yes. And when they're restored, are they maintained inside until the owner picks it up? Sometimes, you know, but we're limited on indoor space. So there will be times where the vehicles will stay outside overnight. Okay. And so if you had to estimate, how many restored vehicles, restored, not people employed parking, how many restored vehicles at any given time would you have to store on the property? um maybe 15 15? inside, because there's a substantial amount of space inside, and then maybe a few outside and they would, you know you'd have to remove the cars from inside, pull the cars in from outside and kind of cycle through them to utilize the space okay, so you're describing at any given time you would have you're working on 15 cars or so yeah okay some of which would be stored inside because you're working on them and 10 outside perhaps because some some of them might be very short term someone could bring a car in that you know maybe the antenna broke so it just comes in and leaves the same day and then there's other cars that will have you know old rot and rust repair where you know that vehicle needs to stay on the premise for weeks at a time so can you describe the characters of the property uh adjacent to you across the street from you in close proximity so we are pretty much surrounded by woods um there's a buffer to the street but i'd say for there's a it's completely fenced in the fence to the street is probably 30 40 feet um to the north of us is a like a sump and then there's a mechanic shop in napa um the uh parts um behind us there's it's again fenced in the fence to there's a train tracks that runs along the back of the property um that's probably about maybe 50 feet um and uh and then on the south it's the south side of the property um there's a a residence that they put up but it's been up for about two years with nobody like living in it just a house that they had recently kind of put up there's a huge buffer between the building and that property all the quote restoration work is done inside so there's no noise no no and that matter of fact is some of the things I'm looking into are like dust extraction kind of like do you would see and woodworking. So health is a major part of it too because the work is very unhealthy. So anything I could do to make that type of work healthier for, you know, the residents of the town and for the people working there. So there's a fan system that will draw dust out with fiberglass filters that will trap anything. There's a spray booth that has, It's all contained. Nothing gets, no gases get out of the, you know, they all get trapped inside the filtration. And that gets changed out regularly. But, yeah, the sound and everything is a lot, like the compressors have mufflers on them, so you wouldn't hear any noise, you know, surrounding the building. Would there be, since this first happened, I guess, in 2011, that was long before I was on the board, Do you since then, would there be any significant change compared to what's basically happening since 2011 at the site? As far as the building is concerned? It's not just the building, but the operations. So we're kind of at the point of, okay, noise and emissions and all the rest of that stuff. It's all the same. Like I said, if anything, it would get better, just more efficient. and just because like you know the technology leans in the direction of that is there a lot of traffic going in and out of your site I wouldn't say it's a considerable amount nothing that impedes the roadway there's a I guess that's ingress and egress is what you come in and out so we do have that in the entrance and um there's substantial parking um inside the property so there would be no buildup of like traffic outside entering and uh how many employees uh we'll probably look at like three or four okay so you have yourself three or four employees and you tell me i don't want to put words a delivery truck or two and a client picking up a car yeah right all done on site and nothing's done in the street um if for whatever reason the car would get towed in that doesn't get unloaded in the street it gets unloaded on the property um and most of the stuff happens actually in the back of the building where there's enough of a buffer of woods and wilderness that you don't even see see it from the street. Pretty much it's all hidden behind the building. That's where those containers are too. And again, it's like a safety thing. It's removing everything we can from inside the shop to create like a safer work environment, more space, less loss, less chance for loss. And an organization too. Be able to keep things kind of organized and protect from, you know, the elements.
Can we do reserve the city and be cool with the conditions for planning? Yes. To create outdoor storage. Reserves. With screen. Reserves. Let's do that. Yeah, right. And if the Zoning Board were to place a requirement on the outdoor storage that it would require final approval of planning staff and building staff together with adequately screened and planted would you have an objection to that absolutely not okay i would just need to know what we would need to do and maybe the time frame that i can you know a reasonable time frame to get that done absolutely right members of the zoning board can we mark this for a reserved decision december 10. second hey mr barnes you're on mute leeward mr barnes aye mr porsche aye so westgate aye We have one more matter on the agenda. It is appeal number 2026-015-413, Craddleville Avenue, sub-county tax map number 600-124-213. I believe we have a decision on this one to be read. Who's got it? I have it. So, Mr. Chairman, with respect to appeal number 2026-015, I move that the appeal of Carlos Santino, 413 Craderville Avenue, Riverhead, Suffolk County Tax Map number 600-124-2-13, which is in residence 840 zoning for variances and or relief from Town Code chapter 301-9a 1c where rear yard setback is 3.3 foot the minimum required is 20 in chapter 301-11 where lot coverage is 21.55% the maximum allowed is 15% district be deemed abandoned this application originally scheduled on July 23rd, 2026 determined a revised as-built survey was needed and adjourned this appeal to September 10th, 2026. As of September 10th, 2026, no additional information was provided and a second adjournment date of October 8th, 2026 was provided. At the second adjournment, again, no additional information was received as originally requested. A final adjournment date was set to November 12th with the documents to be provided within the time parameters stated at the October 8th meeting though the applicant had corresponded with the building department they did not meet these requirements and therefore the zoning board deems that this application abandoned with no refund of associated fees for this application in accordance with the applications and sketches with the amendments there too if any be filed with the building inspector Second. All right, moved and seconded. Mr. Barnes. Aye. Horst. Aye. Sueski. Aye. And I vote aye.
Do we have any meetings to note or anything? To vote on the meeting minutes from last time, from October 22, 2026, they were circulated in an email on November 6, 2026. We're casting everybody in the town. All in favor? Aye. Mr. Biles? Aye. Thank you. Okay. Meeting to be adjourned. Is that the last voting? Leroy, it's good to see you. You too, Otto. Give me a call. To December 10th. December 10th it is. December 10th is the next meeting. 10th. Close. Adjourned. Vote to adjourn. All in favor? Aye. Good night. Safe home, Leroy. Take care.